moviniti as software for sequencing with a 50-minute lead time to production

Project scope The project involved the introduction of the moviniti sequence sequencing software at a site with complex requirements. The aim was to replace an existing solution and ensure just-in-sequence delivery of parts such as cable harnesses and tailgates to an OEM. In addition to the standard implementation, a customized special solution was developed to […]
Digitization of sequencing with moviniti software in just a few weeks

Project scope At our customer’s site in France, various parts families such as door panels, exterior mirrors, and bezels are sequenced for a French automobile manufacturer with a lead time of 50 minutes to production. An average of 175,000 parts are delivered to the OEM each month. Requirements 2 customer-specific interfaces Delivery with planned sequence, […]
20% less processing time thanks to sequencing software

Project scope The customer in the Munich area supplies seat covers in several part families in sequence and just-in-time. The aim of the project was to replace an old system and optimize processes—especially in replenishment and sequencing. The result: 20% savings in process costs and a future-proof solution for production logistics. Requirements 4 interfaces (sequence […]